Friday, July 3, 2026
  • About
  • Advertise
  • Careers
  • Contact
  • Business
    • Deals
  • OpEds
  • Sustainability
  • Women in Business
  • Lifestyle
  • Featured
  • Technology
    • Phones
  • Sports
  • World
  • Contact Us
No Result
View All Result
No Result
View All Result

Home » APO News » Nigeria: The Battery Energy Storage Technology (BEST) Project Steering Committee Meets to Strengthen Coordination for Effective Implementation of the Project

Nigeria: The Battery Energy Storage Technology (BEST) Project Steering Committee Meets to Strengthen Coordination for Effective Implementation of the Project

by Queen Amber
1 hour ago
in APO News
Reading Time: 2 mins read
A A
NewsTrendsKE with APO News Updates
Share on FacebookShare on TwitterShare on WhatsApp


Download logo

The sixth meeting of the Steering Committee for the Regional Project on Access to Electricity and Battery Energy Storage Technology (BEST), a key governance mechanism for the project, was held on 29th and 30th, June 2026 in Abuja, Nigeria to review progress made in implementing the project, assess the main challenges, endorse strategic directions and strengthen coordination between the Project Implementation Units (PIUs) to ensure more effective implementation.

Chaired by the Acting Director of the ECOWAS Directorate of Energy and Mines, Mr William BAIDOE, the meeting brought together representatives of the ECOWAS Commission, members of the Steering Committee and delegates from the PIUs of the five beneficiary countries (Côte d’Ivoire, Mali, Mauritania, Niger and Senegal), as well as members of the project’s Regional Coordination Unit (RCU).

In opening the meeting, the Acting Director of Energy and Mines at ECOWAS emphasised the importance of the energy sector as a key driver of economic and social development in West Africa. He noted that “despite the progress made in recent years, a significant proportion of the West African population continues to face insufficient access to reliable electricity. It is to address this challenge that the World Bank and the ECOWAS Commission have launched a regional programme for access to electricity, implemented through a series of projects.”

Launched in 2021, the BEST Project is the second project under this regional electricity access programme, and it builds on the achievements of previous regional interventions. It also represents a strategic response aimed at sustainably improving access to electricity in five beneficiary countries—whilst introducing battery energy storage technologies, which are essential for stabilising electricity grids, facilitating the integration of renewable energy and improving the quality of electricity supply.

Funded by the World Bank to the tune of 465 million US dollars, the BEST Project aims to improve people’s access to electricity and to contribute to the stability and improvement of energy flows within the EEEOA transmission system. The main components of the project include: (i) the design, supply and installation of electricity distribution infrastructure; (ii) the design, supply and installation of BEST equipment; (iii) works supervision and technical assistance; and (iv) project coordination and technical support.

The BEST Project demonstrates the shared commitment of the ECOWAS Commission, the World Bank and the beneficiary countries to accelerating regional energy integration, strengthening the resilience of West African electricity systems and supporting a sustainable energy transition for the benefit of the population.

The project is coordinated at regional level by the ECOWAS Directorate of Energy and Mines through a Regional Coordination Unit (RCU) based in Abuja, in close collaboration with the Project Implementation Units (PIUs) in each of the beneficiary countries.

Distributed by APO Group on behalf of Economic Community of West African States (ECOWAS).

Previous Post

In Senegal Economic Community of West African States (ECOWAS) Strengthens its Commitment to the Academic Success of Youth in Ziguinchor through the ECOWAS Club of Assane Seck University of Ziguinchor (UASZ)

Next Post

Burkina Faso/Mali/Niger: Withdrawal from the Rome Statute consecrates impunity and threatens to deny victims of war crimes justice and reparations

Related Posts

APO News

Burkina Faso: United Nations (UN) Human Rights to shut down country office

3 July 2026
APO News

Burkina Faso/Mali/Niger: Withdrawal from the Rome Statute consecrates impunity and threatens to deny victims of war crimes justice and reparations

3 July 2026
APO News

In Senegal Economic Community of West African States (ECOWAS) Strengthens its Commitment to the Academic Success of Youth in Ziguinchor through the ECOWAS Club of Assane Seck University of Ziguinchor (UASZ)

3 July 2026
Economy

Kenya’s Private Sector Stabilises as Stanbic PMI Rises to 50.0 in June

3 July 2026

Absa, Unilever Launch KSh4 Billion Financing Deal for Kenyan Distributors and Retailers

2 July 2026

Carrefour Kenya Awards Shoppers Cars, School Fees in KSh20 Million Anniversary Campaign

2 July 2026

KCSE 2025 KNEC Results Online-Only Access

9 January 2026

How Scammers Are Exploiting Kenya’s Economic Pressure, Mobile Money Growth and Election Anxiety

2 July 2026

Kenya’s Social Media Use Hits 18.4 Million as WhatsApp, TikTok Lead Digital Shift

30 June 2026

Kenya’s Public Seal Custody Moves from Attorney General to Head of Public Service

21 May 2025

NewsTrendsKE

A News Blog For Readers Who Want More

Follow us on social media:

  • About
  • Advertise
  • Careers
  • Contact

©2026 NewsTrendsKE.

No Result
View All Result
  • Business
    • Deals
  • OpEds
  • Sustainability
  • Women in Business
  • Lifestyle
  • Featured
  • Technology
    • Phones
  • Sports
  • World
  • Contact Us

©2026 NewsTrendsKE.

Exit mobile version